PERIMETER PROTECTION SYSTEM

INSTALLATION PROCESS

  • Loose frames to be assembled as single frame at site
  • Level checking
  • Screwing the frame to the door
  • Grouting (Foam filling) optional
  • Shutter fixing
  • Fixing of hardware and handles
  • Testing and adjustments if required